We are thrilled to announce a significant milestone in our ongoing Addis Ababa City Eastern Sewerage Catchment project in collaboration with the Addis Ababa Mayor’s office. With a substantial budget of $145 million provided by the World Bank, we are delighted to share that the Mayor’s office has officially appointed CGC OC Contractors for the construction of a sewage water treatment plant. This transformative initiative is tailored to address the needs of 1.2 million residents in eastern Addis Ababa, encompassing Bole, Lemi Kurra, and Yeka subcities.

Simultaneously with this groundbreaking development, MS Consultancy PLC JV Nicholas O’Dwyer Limited has actively assumed the role of the designated consultant for the project. Our involvement spans from conducting a comprehensive Feasibility Study and Detailed Design to preparing Tender Documents for the Design Build Operate (DBO) of the Sewer System. We are honored to play a pivotal role in shaping the success of this endeavor and contributing to the positive transformation of the region.